Mohamed Karmallah

Khartoum

Summary

At SPPS, a skilled Survey Engineer enhanced project outcomes by leveraging GPS and GIS for precision, leading to significant cost savings and client satisfaction improvements. Demonstrated expertise in topographic surveys and advanced surveying technologies (hard skills) alongside exceptional problem-solving abilities (soft skill) ensured compliance and expedited project completions.


Overview

7
7
years of professional experience

Work History

Survey Engineer

SPPS
04.2017 - Current


  • Maximized cost savings for clients by identifying potential issues during pre-construction site evaluations.
  • Coordinated with the engineering department, vendors and subcontractors
  • Improved client satisfaction by providing comprehensive reports tailored to their specific needs.
  • Increased accuracy in project estimations through detailed topographic surveys and site analysis.
  • Facilitated smooth property transactions with accurate boundary surveys and legal descriptions for land parcels.
  • Expedited project completion by utilizing GPS and GIS technologies for precise measurements.
  • Reviewed and checked survey, subdivision and parcel maps to verify compliance with laws.
  • Supported infrastructure development with precise alignment surveys for roadways, bridges, and utilities.
  • Enhanced project efficiency by implementing advanced surveying techniques and equipment.
  • Reported daily activities and observations to the team manager.

Education

Bachelor of Science - Surveying Engineering

University of Khartoum
Khartoum, Sudan
10.2015

Skills

  • Total Station Operation
  • Civil Engineering Knowledge
  • Optical & Digital Levels
  • Construction staking
  • Field data collection
  • Topographic mapping
  • GIS Software Proficiency
  • As-Built Documentation
  • Quality Control Procedures
  • Route surveying
  • Geodetic Control Establishment
  • Land Surveying Expertise
  • Survey project management
  • GPS Technology Mastery
  • Site Plan Preparation
  • GPS knowledge
  • Mathematical Calculations
  • Autodesk Land Desktop

Languages

Arabic
Native language
English
Upper intermediate
B2

experience and projects

Khartoum -Madani Petroleum Products Pipeline Project (KMPP)

Survey and civil works for a 12 inch pipeline with total length of 220km from Khartoum Refinery to Wad Madani, Mother Station and a Terminal Station:

- topographic survey work for route by using the maps from google earth and visit the site in natural using the GPS ( SOKKIA-GRX1)

- establishing the control points for the route along 220 km

-stakeout the route using GPS and Total Station and complete the right of way

-follow up of earth work and trenching for pipeline (leveling & check the depth)

- work in four (valve station) on the pipeline route including fence, solar system,  valve chamber ,cathodic protection points , SCADA shelters , back-filling works.

- Construction works in the Mother Station contain : network piping , pipe supports , electrical instruments , close drain system , pig launcher system ( determine  the anchor bolts by total station and level )

- check the drawings ( alignment sheets , shop drawing , Autocad files , 3D model , isometric drawing , P&ID )

- As built work after make the modifications in route and facilities including the changes in location ( coordinates ) and in the levels .


Madani Strategic Depots  Project (MSDP)

construction of civil works for terminal station includes :

- Survey work of  twelve storage tank for petroleum product with a different capacity includes determine the center and perimeter of tanks , excavation work ,ring beam level, compacted layers of backfilling , follow up the welding work , settlement for ring beam  .

- fire fighting system includes determine the routs of pipes and foam shelter .

- create the pumps shelter by determine the anchor bolts location and level using the Total Station and Digital Level.

- drainage system includes Channels , ditches , sewers system (septic tanks and pits) .

- construction the administration and technical buildings (Laboratory ,MCC and Control Room and Masjid) the works includes stake out the limit of buildings and concert points for slaps and columns , steel structure works .

- Loading Arms Gantry contains the Inlets and exits ways by determine the directions and landscape works .

- Earthworks for platforms, internal and external Roads .


Garri Gasoil Pipeline Project (GGPP)

construction works of an 810 m long, 8-inch diameter Gasoil pipeline from GAT depot to 10 inch exiting pipeline feeding GARRI 3 station:

- design the rout using autocad and google earth.

- surveying  the route by GPS and Total Station  and stake out the center line.

- make the pipe support for  the above ground section .