Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level for engineering technician position. Ready to help team achieve company goals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
DUTIES AND RESPONSIBILITIES
Manage the Staff
· Ensures appropriate staffing consistent with needs and within the constraints of the organization’s physical and financial resources;
· Recruits, selects, orients and develops staff to meet standard performance;
· Plans, organizes, directs, coordinates the Maintenance/Engineering Operations’ work plan; assigns projects and programmatic responsibilities; reviews and evaluates work methods and procedures; meets with staff to identify and resolve problems.
Develop, Plan and Deliver Programs and Services
· Responsible for the short and long term planning and daily operations of the engineering department in order to ensure the overall upkeep and maintenance of the hotel and property;
· Maintains and distributes system of electricity, water, gas, stream etc.;
· Maintains and operates air condition, heater, ventilation and refrigeration system;
· Monitors and coordinates the service performed by outside contractors in accordance to the contract, leases, service agreements and warranties;
· Keeps all record pertaining to heat, light, power and cost of facility while the original document are properly submitted, filed, and recorded;
· Ensures timely response to services request from the guests, employees, and management to repair or replace interior fixtures or furnishing;
· Plans, implements and administrates energy management program;
· Maintains appropriate equipment operating logbook;
· Establishes annual energy reduction objectives;
· Maintains adequate inventory of spare part, tools and supplies;
· Maintains purchasing record, equipment manuals etc.;
· Develops and implements an effective preventive maintenance procedure in accordance with professional engineering practices;
· Trains & supervises subordinates and assist training for all employees on safety & emergency;
· Ensures the development and amendments for all related department’s policies and procedures are kept to date and implemented;
Conducts continuous inspection on the building and ground to ensure the compliance with the relevant fire and safety laws.
Job Description:
· Supervision and Inspection of contractor work.
· Preparing Monthly KPI of the team reported to management.
· Creating daily work plan and cycle schedule for the team.
· Monitoring and repair of all Special effects Features in the building.
· WOW feature – Diamond Feature & crystal feature.
§ Varilite Philips 3500 and 2500 spot and wash, moving lights preventive maintenance and repair.
§ Color Graze, color Kinetics-ball acclaim, color blaze, strobe lights, LED PAR, installation and programming.
§ NEMO sea changer lights repair and preventive maintenance
· Diamond show and Crystal show monitoring.
§ Beam 200 Troubleshooting, Repair and installation.
§ Monitoring of Artistic Color tramp
§ Rhaon Software speaker amplifier programming
§ Close Circuit Television CCTV and lighting programming.
· BGM (Back Ground Music) – Back ground music indoor and outdoor (not included live stage performance, function rooms, and ballrooms.
· WATER FOUNTAIN show – Show control operation
· EXTERNAL LIGHTING – Tower Façade, Landscape Light, and Podium lighting.
§ Conduct tower façade lights use D3 system and program the hardware system.
§ Installation and troubleshooting of different types of lighting fixture and LED lights.
o LASER SHOW SYSTEM – Searchlight and outdoor laser
§ Knowledge’s in corrective and maintenance of Searchlight Alpha 4000 Watts, 7000Watts, and 8000Watts.
§ Knowledge’s in Laser Fantasy Operation and Maintenance
§ Knowledge in Pangolin Beyond operation and maintenance.
o LED and LCD Screen – Indoor and Outdoor.
§ LED screen monitor preventive maintenance and Installation
o LOGO and SIGNAGE – LED STRIP and RGB LED System.
Heavy Equipment Handled: – Genie GS3246, Genie GR-20, Genie Z-45, Spider FS520C, Spider Hinowa, Spider FS370 and FS290, Bluelift C22, Buggy
Job Description:
· Supervises: A/C Technician, Plant Attendant, Civil Works Technician, Electro-mechanical Technician, FDAS Technician, Reporting: Assistant Chief Engr.
· Strives to do better in implementing best practices and be responsible to carry out operation of building equipment and facilities and its scheduled preventive maintenance program, provision of other building services and schedule and coordination of events and activities.
· Duties and Responsibilities:
o Directs and supervises shift crews in repair and maintenance (after office hours), janitorial, security, and project staff.
o Prepares monthly reports regarding fuel, water, electricity usage, charts and data, equipment and building condition as seen and evaluated by the team he handles, submits and discusses with the chief engineer giving his own suggestions and recommendations for corrections and improvement.
o Periodically inspects the entire building and its provision in conclusion with the Chief Engineer to ensure the safe, continuous and efficient utilities supplies and technical service.
o Confers regularly with the Chief Engineer and bring up technical concerns, holds regular meeting with his staff to evaluate their own operation, thresh out problems and develop solution to the problems.
o Prepares and submits report to the chief Engineer on any incident affecting the continuity operations, causing damages to equipment and facilities.
o Recommended parts and materials requisition to storekeeper.
o Observes and implements, RCBC Plaza rules and regulations.
o Does other job that maybe assigned by his superiors.
Finish Project: TOYOTA AUTO PARTS (TAP)
Location: Sta. Rosa, Laguna
Date: March– Oct. 16, 2009
Job Description:
· General Responsibilities
o Coordinate projects with other department, consultant, contractor, engineers, supervisor, and the other workers.
o Make engineering calculation in connection with the field and office assignment.
o Obtain permit for operation
o Prepare and review engineering plans, specification, project schedules and related to electrical system.
o Investigate problems and recommend solution.
o Main effective good working relationship with field engineers, supervisor, contractors, vendors, the public and the company staff.
o observe punctuality at work.
o Ensure compliance with safety requirements standard procedure.
· Detailed Job Description
o TAP GYM
§ Supervision for electrical works
§ Checking for actual electrical installation inside Toyota Gym
§ Make as build plan for new electrical installation lay-out
§ Give schedule for daily activities work of manpower
§ Monitoring for electrical materials
§ Performs such other duties maybe assigned from time to time.
§ Coordinator
o TAP SUB-STATION
§ Supervision for electrical works
§ Installation for current transformer(CT) with meter
§ Monitoring for temperature of capacitor at capacitor bank.
§ Monitoring for electrical materials
§ Performs such other duties maybe assigned from time to time.
§ Coordinator
Finish Project: YAMAHA MOTORS PHIL. INC.
Location: Lima, Lipa Batangas City
Date: Sept. 2008 to Feb. 2009
Job Description:
· Supervision for electrical works
· Give schedule for daily activities work of manpower
· Monitoring for electrical materials
· Performs such other duties maybe assigned from time to time.
· Coordinator
Finish Project: PPA Vessel Traffic Management system (VTMS)
Location: Batangas City
Date: Feb. 2008 – Aug. 2008
Job Description:
· Project In-charge for electrical and mechanical works.
· Supervision for electrical and mechanical works and site inspection
· Designing, editing for electrical and mechanical plan lay-out
· Give schedule for daily activities work of manpower
· Monitoring for electrical materials
· Performs such other duties maybe assigned from time to time.
· Coordinator
Finish Project: PNOC Northern Negros Geothermal Plant
Location: Bacolod, Negros Occidental
Date: June 2007 – Jan. 2008
Job Description:
· Supervision for electrical works and site inspection
· Give schedule for daily activities work of manpower
· Monitoring for electrical materials
· Performs such other duties maybe assigned from time to time.
· Coordinator
Finish Project: Hotel Philippine Plaza
Location: CCP Complex, Manila
Date: Sept. 4, 2006 - May 2007
Job Description:
· Supervision for electrical and mechanical equipment
· Preventive maintenance for all equipment such as electric motor, motor pump, compressor, cooling tower, air condition unit.
· Give schedule for daily activities work of manpower
· Monitoring for electrical materials
· Performs such other duties maybe assigned from time to time.
· Coordination to the facilities of the building
Electrical Engineering works
Autocad operator
Heavy Equipment Handled: – Genie GS3246, Genie GR-20, Genie Z-45, Spider FS520C, Spider Hinowa, Spider FS370 and FS290, Bluelift C22, Buggy
Electrical installation
Documentation and reporting
Mechanical and electrical works for Hotel and Casino
Preventive maintenance planning