

Dynamic Senior Field Specialist skilled in completion design and risk assessment. Proven track record in enhancing field operations and ensuring safety compliance. Adept at fostering customer relationships and delivering quality assurance, while effectively leading teams to optimize processes and achieve operational excellence.
Highly-motivated employee with desire to take on new challenges. Strong work ethic, Team Work in multinational peoples, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
Hardworking employee with customer service, multitasking, and time management abilities.
Course
Workshop & Seminar
Field Supervisor, Schlumberger – Completion Australia (STA)
- 2 Wells ( JULA-G & JULB-B ) Open hole Gravel Pack Installation with Optipac Screen, with FIV running by 9-5/8 x 6 ASST 10 K
- Client: Woodside Australia
Field Supervisor, Schlumberger – Completion Turkmenistan (STA)
Well Preparation and Job Execution for CD-2, Lower & Upper Completions
- First installation of Cased Hole High-rate water Pack in Single Zone Executed with 7 x 4 QMAX FBSD Service Tool with accessories Allfrac screens, Safety shear sub, Formation Isolation Valve (FIV) in Petronas Turkmenistan
- Upper Completion with accessories: NO-GO Locator, 5-1/2 Landing Nipple, 9-5/8 X 5-1/2 BLUEPACK MAX RH, 5-1/2 SGM-FS ASSY, METRIS, SINGLE, 7 IN SLIMTECH, 7 DCIN II
Client: Petronas Carigali Turkmenistan Sdn Bhd, Saturn Rig, Jack up operation
Field Supervisor, Schlumberger – Completion Balikpapan
Well Preparation and Job Execution for JNE-7 ST, ME-04 ST and ME-02 ENI Lower Completions & Upper Completions
Execute Lower Completions with Design,
- 2 well: JNE-7 ST, ME-04 ST (Cased Hole Frack Pack (CHFP) in Multizone (3 zone) Executed with 7 x 4 QMAX FBSD Service Tool
- 1 well: ME-02 for Cased Hole Gravel Pack (CHGP) in Multizone (2 zone) Executed with 10-3/4 x 6 QMAX FBSD Service Tool with FIV & AFIV
Client: ENI Indonesia, SSV Catarina, Subsea operation
Field Supervisor, Schlumberger – Completion Brunei Darussalam (STA)
- Multi zone Open hole Gravel Pack Installation with Optipac Screen, SHUNTED SALTEL OPEN HOLE ISOLATION PACKER ASSEMBLY running by 9-5/8 x 6 ASST and 3-1/2" BEST TOOL & MUD PULSE
- Upper Completions Executed with 3-1/2 ENDURE SCREEN followed with Swell Packer, Landing Nipple, Nogo Locator, 9-5/8 X 3-1/2 BLUEPACK MAX RH and 3-1/2 TRMAXX Safety Valve
- Client: Brunei Shell Petroleum (BSP) Brunei Darussalam
Field Supervisor, Schlumberger – Completion India (STA)
- Open Hole Gravel Pack with FIV, deployed using 9-5/8 x 6 Anti swab mud solve Service tool
Client: ONGC India
Field Supervisor, Schlumberger – Completion Duri & Jakarta
Field Supervisor for Operations in Duri PHR and Pertamina EP
- Lateral Clean Up (LCU) Program, execute 4 ea. Well of Horizontal Open hole Stand Alone Screen Installation with Perforated Liner, running by 9-5/8 x 6 NPS Type 3 Hybrid Service Tool
- Execute 2 ea. Well of Horizonal Open Hole Stand Alone Screen in Shallow Well running by 7 X 4 NPS Type 3 Service Tool
Client: PHR
- Execute 1 Well of Upper Completion installation with XN Nipple, X Nipple, Gas lift Mandrel, TRSV, and 7 x 4 Bluepack Max Packer
Client: Pertamina EP
Field Supervisor, Schlumberger – Completion India (STA)
Execute 2 Well for Upper and Lower Completions
- CHGP Operation with Fortress Installation on Deep water Gas Well using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL
- Upper Completion installation with CIM for Scale, methanol, wax; RMC permanent downhole gauge, TRC, and 9-5/8 Blue pack Max Packer
Client: ONGC India
Field Supervisor, Schlumberger – Completion Balikpapan
9-5/8 External Casing Packer (ECP-C) Expandable Steel Packer Saltel Product Installation
Field Supervisor, Schlumberger – Completion Balikpapan
Field Supervisor for 1 well Jangkrik Sidetrack well JKK-12ST and Merakes side track Open hole Gravel Pack 2 Well
- 1 well Cased Hole Gravel Pack (2 Zone) Using 7x4 QUANTUM MAX FBSD FLOATER SERVICE TOOL – Deep Water
- 2 well Open Hole Gravel Pack (2 Zone) with OptiPac Screen, deployed using 7 x 4 Antiswab Service tool – Deep Water
CIient: ENI Indonesia
Field Supervisor, Schlumberger – Completion Duri
Horizontal Open Hole Campaign, execute 7 ea. Well of Horizonal Open Hole Stand Alone Screen in Shallow Well running by 7 X 4 NPS Type 3 Service Tool
Client: PHR
Field Supervisor, Schlumberger – Completion Australia ( STA )
Execute 2 Well OHGP and 1 Well POOH for abandonment,
- 1 well Open Hole Gravel Pack (2 Zone) with OptiPac XL, * Alternate Path Screens, STIV and OSMP Packer, deployed using 9-5/8 x 6 Antiswab Service tool with OSMP and STIV Shifting tool
- 1 Well Open Hole Gravel Pack (1 Zone) with OptiPac* Alternate Path Screens deployed using 9-5/8 x 6 Antiswab Service tool
- POOH Upper Completion for Permanent Well abandoned
Client: Woodside
Field Supervisor, Schlumberger - Completions Balikpapan
West Ganal Maha Exploration Well Project Maha Sub Sea Gas Exploration Well
Supervise Well site Execution for 1 Well Maha -02 with Single Zone Gravel Pack using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL – Deep Water
Client: ENI
Field Supervisor, Schlumberger - Completions Balikpapan
ENI Merakes Project
Merakes Sub Sea Gas Field Development, intelligent completions in deep water environment.
Supervise well site execution for 5 Well Intermediate completion (ME-3, ME-4, ME-5, ME-6, ME-7) with accessories consist of Formation Isolation Valve (FIV) & Annular Formation Isolation Valve (AFIV) with Quantum Max Packer Installation
Secondhand , Schlumberger - Completions Balikpapan
ENI Merakes project
Merakes Sub Sea Gas Field Development, intelligent completions in deep water environment.
Perform as Secondman for 2 multizones wells consist of deep-set safety valve, flow control valves (ODIN AP and ODIN LP, depth of FCVs between 1800 – 2200-meter MD), feed-thru V0 hydraulic set packer, isolation valves, chemical injection assembly, nipples.
Secondman, Schlumberger - Completions Balikpapan
ENI Merakes Project
Merakes Sub Sea Gas Field Development, single trip Multizone Gravel Pack completions in deep water environment.
Perform as secondman at well site execution & Workshop Preparation for 2 Gravel Pack Multizone Wells (2 zone) Sand Management services - completion Installation using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL (ME-5) & 7 x 4 QUANTUM MAX FBSD FLOATER SERVICE TOOL (ME-3)
Field Supervisor, Schlumberger - Schlumberger - Completions Jakarta
Jackup Rig and workover for oil and gas producer well in offshore environment.
- 8 Well, Supervise for Memory Gauge Installation with Drill pipe gauge carrier to support downhole tools in Fracturing Operation for 8 wells at Offshore northwest java sea.
Client: PHE ONWJ
- Perform inspection for 9-5/8 X 6 MZ Express Equipment as of excess stock of client inventory for reused or refurbish purposes
Client: Medco Energi E & P, Medco Energi Onshore facilities, Matak, Kepulauan Seribu
Workshop Supervisor, Schlumberger - Schlumberger - Completions Jakarta
PHE ONWJ
Perform as Team Leader for Workshop Preparations for:
- 2 wells Upper Dual String Completion (2-7/8 & 3-1/2 String), Using Savety Valve, nipples, SSD, Etc
- 8 Wells Upper Completion, Using Savety Valve, nipples, SSD, etc.
Workshop Supervisor, Schlumberger - Schlumberger - Completions Russia, Sakhalinsk (STA)
Exxon Neftegas Limited
Perform Team Leader for Workshop Preparations for:
- 9-5/8 x 6 Multilateral Operation,
- Open hole Gravel Pack Operation using 9-5/8 x 6.00 Quantum Anti Swab (Washdown) FBSD
- Open Hole Stand Alone Screen using 9-5/8 X 6 Quantum Max Type IV Service Tool
Workshop Supervisor, Schlumberger - Schlumberger - Completions Malaysia, Labuan (STA)
Petronas Carigali Sdn Bhd,
Perform Team Leader for Workshop Preparations for:
- PDG Installation & PDG Surface Set up Operation (RMC Operation),
- Open hole Gravel Pack Operation using 9-5/8 x 6.00 Quantum Anti Swab (Washdown) FBSD
- Cased hole PerfPack Operation using 7 X 4.00 Quantum Max POIT FBSD
Secondman, Schlumberger - Completions Balikpapan
Chevron IDD
Perform as Secondman and Successfully in 2 wells deep water (Bangka – 6 & Bangka -7) of Completion installation on Bangka Field Development project for operation below:
- Stimpac Operation with FIV Installation and APS Systems on Deep water Well using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL
- Upper Completion Installation with XHP Packer, Chemical Injection Valve, Tubing Retrievable Safety Valve (TRSV) and SFIV (2 wells)
- Perform as supervisor on Diagnostic and Opening FIV and SFIV for Well Production
Field Supervisor, Schlumberger - Completions Balikpapan
Perform as Filed supervisor for completion operations as below:
- 1 well Open hole Stand Alone Screen Installation in Shallow well, running by 9 5/8 X 6 NPS Type 3 Service Tool
Client: Total Indonesia E&P
- 1 well 5 x 2.688 Quantum Packer Installation in workover well
- 1 well of POOH Existing completion
- Frack n pack operation at workover well using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL
Client: Chevron IBU
Secondman, Schlumberger - Completions Balikpapan – Duri
- 1 well, Perform as Secondman in Multizone Gravel Pack APS operation using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL
Client: Total Indonesia E & P, Balikpapan
- 1 well, ESP Completion Installation
Client: chevron IBU, Balikpapan
- 1 well RMC Completion with DLH Packer and NDPG Installation
Client: CPI, Duri
Field Supervisor, Schlumberger - Completions Duri
Chevron Pasific Indonesia
Perform as Field superviosr at Drilling rig, lower completions installation in Land rig for operation below:
- Horizontal Open hole Stand Alone Screen Installation in Shallow well, running by 9 5/8 X 6 NPS Type 3 Service Tool
- Retrieve RMC completion works over well. Minas, Riau
Field Supervisor, Schlumberger - Completions Jakarta
BP Tangguh LNG
- Perform as field supervisor for Permanent packer installation set by 7 X 4 Wireline adapter kit to support Well Testing operation multizone (2 zone)
Field Supervisor Schlumberger - Completions Duri
Perform as Field Supervisor including workshop preparation and focal point at to the client in the wellsite and execute job for
- 8 well of Horizontal Open hole Stand Alone Screen Installation in Shallow well, running by 9 5/8 X 6 NPS Type 3 Service Tool
- 3 well of Memory Gauge installation in Swabbing operation at, Work Over Well
Junior Field specialist - Secondman,
Schlumberger - Completions Duri-Balikpapan
Involved in job preparation at the workshop and working as Secondman for job execution at the well site for some of lower completion installations for Client at Duri & Balikpapan:
- 2 well of Horizontal Open hole Stand Alone Screen Installation in Shallow well, running by 9 5/8 X 6 NPS Type 3 Service Tool
- High-Rate Water Pack running by 7 x 4 QUANTUM MAX FBSD FLOATER SERVICE TOOL
- 2 Recompletion Wells with High-Rate Water Pack running by 7 x 4 QUANTUM MAX FBSD FLOATER SERVICE TOOL
- 3 wells ESP Completion Installation
Junior Field Specialist - Crew Member, Schlumberger - Completions Balikpapan-Duri
Involved in job preparation at the workshop and working as crew member for job execution at the well site for some of lower completion installation:
- 1 well of Single Trip Multi Zone High-Rate Gravel Pack MZ XPRESS. 2nd RUN in Indonesia; running by 7 X 2.813 QUANTUM MAX FBSD MZ XPRESS Service tool
Client: Chevron IBU, Balikpapan
- 1 well of Horizontal Open hole Stand Alone Screen Installation in Shallow Well, running by 9 5/8 X 6 NPS Type 3 Service Tool
Client: CPI, Duri
- 1 well of Memory Gauge installation in Swabbing operation at, Work Over Well
Client: CPI, Duri
- 1 High-Rate Water Pack running by 7 x 4 QUANTUM MAX FBSD FLOATER SERVICE TOOL
- 1 well ICD Premium Standalone Screen Completion Installation with MFIV, running by 7 X 4.000 QUANTUM ANTI-SWAB MUDSOLV FULL BORE SETDOWN SERVICE TOOL, FLOATER