Summary
Overview
Work History
Education
Skills
Personal Details
Languages
Hobbies and Interests
Accomplishments
Safety, Health & Environment Course
Course, Workshop And Seminar
Field Trip And Observation
Job Experience Summary
Timeline
Generic
Gan Gan  Ginanjar

Gan Gan Ginanjar

Bandung

Summary

Dynamic Senior Field Specialist skilled in completion design and risk assessment. Proven track record in enhancing field operations and ensuring safety compliance. Adept at fostering customer relationships and delivering quality assurance, while effectively leading teams to optimize processes and achieve operational excellence.

Highly-motivated employee with desire to take on new challenges. Strong work ethic, Team Work in multinational peoples, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Hardworking employee with customer service, multitasking, and time management abilities.

Overview

15
15
years of professional experience

Work History

Senior Completions Field Specialist

PT Dowell Anadrill Schlumberger
CIB Jakarta Operations
09.2016 - Current
  • Designing completion well diagram based on client requirement
  • Lead workshop preparations based on design and ensuring that the Workshop Team delivers Safe, Efficient, and Reliable Products
  • Execute and supervision completion job in the well site
  • Deliver quality assurance of service and product to client
  • Person who can give advice/consulting of completion design and execution
  • Coordinated field operations and logistics for drilling projects across various locations.
  • Prepared detailed reports of field activity, including progress made, challenges encountered, and recommendations for improvement.
  • Identified areas of risk associated with certain aspects of field operations activities.
  • Managed equipment maintenance schedules to ensure operational readiness at all times.
  • Led safety briefings and ensured compliance with industry regulations on-site.
  • Collaborated with engineering teams to optimize completions procedures and techniques.
  • Trained new staff on safety protocols and operational procedures in the field.
  • Assisted in the development of site-specific operational plans for Completions activities.
  • Developed strong relationships with customers through effective communication techniques.

Junior Completions Field Specialist

PT Dowell Anadrill Schlumberger
Balikpapan
08.2013 - 09.2016
  • Managed field operations to ensure compliance with safety and environmental standards.
  • Coordinated equipment maintenance and troubleshooting for Completions activities.
  • Assisted with the installation and testing of downhole tools and systems.
  • Collaborated with teams to optimize Completions procedures and enhance efficiency.
  • Documented field data and maintained accurate records for reporting purposes.
  • Communicated effectively with clients to address technical inquiries and requirements.
  • Contributed to risk assessment processes for various project scenarios.
  • Ensured compliance with safety regulations when performing work onsite at customer locations.

Field Specialist Trainee

PT Dowell Anadrill Schlumberger
Balikpapan
09.2012 - 09.2013
  • Assisted in planning and executing field logistics for drilling projects.
  • Collaborated with engineering teams to implement process improvements in operations.
  • Identified areas where improvements could be made to existing processes or procedures.
  • Assisted in training customers on proper use of installed system components or software applications.
  • Participated in meetings with other departments to discuss product issues or customer feedback.
  • Worked closely with sales representatives when generating quotes or estimates for new projects.
  • Ensured compliance with safety regulations when performing work onsite at customer locations.
  • Disassembled and reassembled hydraulic, and mechanical equipment for inspection.
  • Documented repair methods and maintenance processes to improve support analysis.

Assistant Project

PT Pindad
05.2012 - 07.2012
  • Process Evaluation of Wastewater Treatment Plant
  • Safety at work places training
  • Supported project coordination for defense and manufacturing initiatives.
  • Assisted in data entry and management for operational reporting systems.
  • Organized meetings, preparing agendas and taking detailed minutes for discussions.
  • Maintained accurate records of inventory and equipment usage across departments.
  • Organized and maintained filing systems for documents and records.
  • Entered data into databases accurately and efficiently.
  • Gathered and sorted data for reports and files.
  • Assisted in the development of new policies and procedures to improve operational efficiency.

SHE Officer

PT Pama Persada Nusantara
Sangatta
08.2011 - 03.2012
  • Coal Mining Contractor
  • PROJECT: PINTAR (Pama SHE Integrated Training and Certificate)
  • Conducted safety audits to ensure compliance with environmental regulations.
  • Developed training programs for staff on health and safety procedures.
  • Implemented risk assessments to identify potential workplace hazards.
  • Collaborated with teams to promote a culture of safety and environmental awareness.
  • Reviewed incident reports and recommended corrective actions for future prevention.
  • Facilitated emergency response drills to prepare employees for potential incidents.
  • Monitored environmental performance metrics and reported findings to management.
  • Assisted in the development of policies to enhance workplace sustainability practices.
  • Provided training to employees on safety protocols and procedures.
  • Monitored air quality, noise levels, chemical exposure, ergonomics, radiation protection. in the workplace.
  • Promoted a culture of safety by encouraging employees to report unsafe conditions without fear of reprimand.
  • Investigated incidents and accidents to determine root causes and corrective actions needed.
  • Analyzed data from incident reports to develop trends and suggest improvements to safety systems.
  • Maintained records of all EHS activities conducted at the organization's facilities including incident reports, audit results, inspection logs.
  • Reviewed existing processes, procedures periodically for effectiveness in meeting applicable regulations, standards.
  • Prepared reports of findings related to EHS activities including inspections, investigations, audits, or surveys.
  • Conducted safety training or education programs to demonstrate use of safety equipment.

Internship

PT Pertamina Hulu Energy ONWJ
Offshore
02.2011 - 03.2011
  • Process Evaluation of Oily Water Treatment Plant at NGL C Central Station
  • Oil & Gas Company
  • Contributed innovative ideas and solutions to enhance team performance and outcomes.
  • Identified needs of customers promptly and efficiently.
  • Maintained updated knowledge through continuing education and advanced training.
  • Provided support and guidance to colleagues to maintain a collaborative work environment.
  • Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.

Education

Bachelor of Science - Industrial Engineering

Bina Nusantara University
Jakarta
04-2023

Associate of Applied Science - Chemical Engineering

Politeknik Negeri Bandung
Bandung, West Java, Indonesia
10-2011

SENIOR HIGH SCHOOL -

SMA Negeri 1 Baleendah
Bandung
01.2008

JUNIOR HIGH SCHOOL -

SLTPN 1 Ciparay
Bandung
01.2005

ELEMENTARY SCHOOL -

SDN 1 Bina Harapan
Bandung
01.2002

Skills

  • Upper completion: Production Packer, Flow Control Valve, ESP Packer, Safety Valve, Gas Lift Mandrel, Landing Nipple, Sliding Sleeve, POP, Solid Gauge Mandrel, Chemical Injection Mandrel, Nogo/ snaplatch locator, Lock out Tool, etc
  • Lower Completion : Stand Alone Screen, Cased Holed Gravel Pack , Open Hole Gravel Pack ( Stack Pack & Single Zone) with FIV & AFIV, etc
  • Field operations with working environment : Shallow water (Snubbing Unit, Jack up Rig) and Deep water (Semi-submersible Rig)
  • Well site supervision
  • Quality assurance
  • Risk assessment
  • Equipment maintenance
  • Customer relationship management
  • Project coordination
  • Field operations management
  • Safety compliance
  • Problem solving
  • Data collection and analysis
  • Effective communication
  • Team collaboration
  • Process improvement

Personal Details

  • Date of Birth: 26 June 1990
  • Gender: Male
  • Nationality: Indonesian
  • Marital Status: Married

Languages

  • English
  • Bahasa
  • Sunda

Hobbies and Interests

  • Reading
  • Football
  • Jogging
  • Traveling

Accomplishments

  • 2008 – 2011, POLBAN, Scholarship achievement program
  • 2011, PT Pertamina Hulu Energi, Internship Program Presented “Process Evaluation of Oily Water Treatment Plant at NGL C Central Station”
  • 2010, Polytechnic Olympiad Creativity, 5th Position in Recycling Plastic Bottle
  • 12/22/10, Entrepreneur Student Program (PMW – DIKTI), Social Entrepreneur: Processing household organic waste to be compost at Ciwaruga (PUKINDO KAIZEN)
  • 02/08/11, Creativity Student Program – Research (PKMP – DIKTI), FINAL PROJECT: Modification of Composting Media with Addition of Tofu Waste, Waste of Oyster Mushroom Growing Media and Vinasse

Safety, Health & Environment Course

  • 26-Sep-25 : Escape Cute Training, ERGT Australia (25-Sep-29)
  • 25-Sep-25 : OGUK Offshore Medical, Sonic Health Plus Australia (25-Sep-27)
  • 06-Aug-25 : Basic H2S Training, Takyk Abzal, Turkmenistan (05-Aug-27)
  • 05-Mar-24 : Further Offshore Emergency Training (FOET) with Emergency Breathing System (EBS) PT Lautan Tenang Jaya - Indonesia (8th March 2028)
  • 20-Oct-21 : Compressed Air Emergency Breathing System (CA-EBS) Perth, West Australia (Permanent)
  • 12-Oct-21 : Well Control Level 1, IWCF Online Test

Course, Workshop And Seminar

Course

  • 9 – 13 July 2019 : ISO 14001, 18001, 45001 Training for Auditor, SLB Cikarang Integrated Base
  • 29 Sept – 6 Oct 2018 : Workshop Technician Course, Middle East Learning Centre, Abu Dhabi
  • May 4th – June 4th 2015 : Intermediate SMS Field Specialist ST-2 Course, Middle East Learning Centre, Abu Dhabi
  • Nov-14 : Well Builder and TDAS Training. Schlumberger Base Balikpapan, Indonesia
  • June 6th – 21th 2014 : Formation Isolation Valve Course, Middle East Learning Centre, Abu Dhabi
  • April 7th – May 9th 2013 : Basic SMS Field Specialist ST-1 Course, Middle East Learning Centre, Abu Dhabi
  • February 27 – 29th 2013 : SMS Wellsite Hardware, Schlumberger Base Balikpapan, Indonesia
  • Sept 24 – 28th 2012 : OFS-1 – Introduction to Oilfield Services, Park Lane Hotel, Jakarta, Indonesia

Workshop & Seminar

  • September 25th 2011 : New Quantum Circle cycle for Group Leader Training, Jakarta, Indonesia
  • July 16th – 17th 2011 : Quality, Management and Safety Health Environment ISO Training, Jakarta Indonesia
  • June 14th – 15 th 2011 : National Meeting and Founding of HIPMI PT Workshop, Bandung, Indonesia
  • May 21th 2011 : Improvement of Bargaining Position Workshop “ Prepare Your Trategic Job”, Polban, Indonesia
  • May 14th 2011 : Centre Workshop & K3 seminar, Polban, Indonesia
  • February 7th 2011 : Sea Survival Course at Jakarta Offshore Training, Jakarta, Indonesia
  • September 25th 2010 : Paper & Research National Workshop, Bandung, Indonesia
  • March 20th 2010 : Boost Your Potentials Seminar, Bandung, Indonesia
  • September 29th 2009 : Writing and Effective publication Training, Bandung, Indonesia
  • October 25th 2008 : Leadership and Managerial Student Training, Bandung, Indonesia

Field Trip And Observation

  • 02/2009, PT Polysindo Eka Perkasa, Petrochemical and Polyester Company
  • 04/2009, PT Amerta Indah Otsuka, Food and Beverage Company
  • 04/2009, PT Yakult Indonesia Persada, Food and Beverage Company
  • 11/2010, PT Pertamina Unit Refinery IV Balongan, Oil and Gas Company
  • 01/2011, PT Indocement Tunggal Prakarsa, Cement Company

Job Experience Summary

  • Sept 2025 – January 2026

Field   Supervisor, Schlumberger – Completion Australia (STA)

- 2 Wells ( JULA-G & JULB-B ) Open hole Gravel Pack Installation with Optipac Screen, with FIV running by 9-5/8 x 6 ASST 10 K

- Client: Woodside Australia

  • August – Sept 2025

Field   Supervisor, Schlumberger – Completion Turkmenistan (STA)

Well Preparation and Job Execution for CD-2, Lower & Upper   Completions

- First   installation of Cased Hole High-rate water Pack in Single Zone Executed with   7 x 4 QMAX FBSD Service Tool with accessories Allfrac screens, Safety shear   sub, Formation Isolation Valve (FIV) in Petronas Turkmenistan

- Upper Completion with accessories: NO-GO Locator, 5-1/2 Landing Nipple, 9-5/8 X   5-1/2 BLUEPACK MAX RH, 5-1/2 SGM-FS ASSY, METRIS, SINGLE, 7 IN   SLIMTECH, 7 DCIN II

Client:   Petronas Carigali Turkmenistan Sdn Bhd, Saturn Rig, Jack up operation

  • Oct 2024 – July 2025

Field   Supervisor, Schlumberger – Completion Balikpapan

Well Preparation and Job Execution for JNE-7 ST, ME-04 ST and   ME-02 ENI Lower Completions & Upper Completions

Execute   Lower Completions with Design,

- 2 well: JNE-7 ST, ME-04 ST (Cased Hole Frack Pack (CHFP) in Multizone (3 zone)   Executed with 7 x 4 QMAX FBSD Service Tool

- 1 well: ME-02 for Cased Hole Gravel Pack (CHGP) in Multizone (2 zone) Executed with   10-3/4 x 6 QMAX FBSD Service Tool with FIV & AFIV

Client:   ENI Indonesia, SSV Catarina, Subsea operation

  • Sept 2024

Field   Supervisor, Schlumberger – Completion Brunei Darussalam (STA)

- Multi zone Open hole Gravel Pack   Installation with Optipac Screen, SHUNTED SALTEL OPEN HOLE ISOLATION PACKER   ASSEMBLY running by 9-5/8 x 6 ASST and 3-1/2" BEST TOOL & MUD PULSE

- Upper Completions Executed with 3-1/2   ENDURE SCREEN followed with Swell Packer, Landing Nipple, Nogo Locator, 9-5/8   X 3-1/2 BLUEPACK MAX RH and 3-1/2 TRMAXX Safety Valve

- Client: Brunei Shell Petroleum (BSP)   Brunei Darussalam

  • June – July 2024

Field   Supervisor, Schlumberger – Completion India (STA)

- Open Hole Gravel Pack with FIV, deployed   using 9-5/8 x 6 Anti swab mud solve Service tool

Client: ONGC India

  • Sept 2023 – April 2024

Field   Supervisor, Schlumberger – Completion Duri & Jakarta

Field   Supervisor for Operations in Duri PHR and Pertamina EP

- Lateral Clean Up (LCU) Program, execute   4 ea. Well of Horizontal Open hole   Stand Alone Screen Installation with Perforated Liner,   running by 9-5/8 x 6 NPS Type 3 Hybrid Service Tool

- Execute 2 ea. Well of Horizonal Open   Hole Stand Alone Screen in Shallow Well running by 7 X 4 NPS Type 3 Service   Tool

Client: PHR

- Execute 1 Well of Upper Completion   installation with XN Nipple, X Nipple, Gas lift Mandrel, TRSV, and 7 x 4   Bluepack Max Packer

Client: Pertamina EP

  • May – July 2023

Field   Supervisor, Schlumberger – Completion India (STA)

Execute   2 Well for Upper and Lower Completions

- CHGP Operation with Fortress   Installation on Deep water Gas Well using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER   SERVICE TOOL

- Upper Completion installation with CIM   for Scale, methanol, wax; RMC permanent downhole gauge, TRC, and 9-5/8 Blue   pack Max Packer

Client: ONGC India

  • Feb – March 2023

Field   Supervisor, Schlumberger – Completion Balikpapan

9-5/8 External Casing Packer (ECP-C) Expandable Steel Packer   Saltel Product Installation

  • August 2022 – Jan 2023

Field   Supervisor, Schlumberger – Completion Balikpapan

Field   Supervisor for 1 well Jangkrik Sidetrack well JKK-12ST and Merakes side track Open   hole Gravel Pack 2 Well

- 1 well Cased Hole Gravel Pack (2 Zone) Using   7x4 QUANTUM MAX FBSD FLOATER SERVICE TOOL – Deep Water

- 2 well Open Hole Gravel Pack (2 Zone) with   OptiPac Screen, deployed using 7 x 4 Antiswab Service tool – Deep Water

CIient: ENI Indonesia

  • Jan – June 2022

Field   Supervisor, Schlumberger – Completion Duri

Horizontal   Open Hole Campaign, execute 7 ea. Well of Horizonal Open Hole Stand Alone   Screen in Shallow Well running by 7 X 4 NPS Type 3 Service Tool

Client:   PHR

  • Oct – Dec 2021

Field   Supervisor, Schlumberger – Completion Australia ( STA ) 

Execute 2 Well   OHGP and 1 Well POOH for abandonment,

- 1 well Open Hole Gravel Pack (2 Zone) with OptiPac   XL, * Alternate Path Screens, STIV and OSMP Packer, deployed using 9-5/8 x 6 Antiswab Service tool with   OSMP and STIV Shifting tool

- 1   Well Open Hole Gravel Pack (1 Zone) with OptiPac* Alternate Path Screens   deployed using 9-5/8 x 6 Antiswab Service tool

- POOH Upper Completion for Permanent Well   abandoned

Client:   Woodside

  • May – June 2021

Field   Supervisor, Schlumberger - Completions Balikpapan

West   Ganal Maha Exploration Well Project Maha Sub Sea Gas Exploration Well

Supervise Well   site Execution for 1 Well Maha -02 with Single Zone Gravel Pack using 9 5/8 X   6 QUANTUM MAX FBSD FLOATER SERVICE TOOL – Deep Water

Client:   ENI

  • Oct 2020 - Feb 2021

Field   Supervisor, Schlumberger - Completions Balikpapan

ENI   Merakes Project

Merakes   Sub Sea Gas Field Development, intelligent completions in deep water   environment.

Supervise well   site execution for 5 Well Intermediate completion (ME-3, ME-4, ME-5, ME-6,   ME-7) with accessories consist of Formation Isolation Valve (FIV) &   Annular Formation Isolation Valve (AFIV) with Quantum Max Packer Installation

  • Jan – Feb 2021

Secondhand   , Schlumberger - Completions Balikpapan

ENI   Merakes project

Merakes   Sub Sea Gas Field Development, intelligent completions in deep water   environment.

Perform as   Secondman for 2 multizones wells consist of deep-set safety valve, flow   control valves (ODIN AP and ODIN LP, depth of FCVs between 1800 – 2200-meter MD),   feed-thru V0 hydraulic set packer, isolation valves, chemical injection   assembly, nipples.

  • Sept 2019 – Feb 2020

Secondman,   Schlumberger - Completions Balikpapan

ENI   Merakes Project

Merakes   Sub Sea Gas Field Development, single trip Multizone Gravel Pack completions in   deep water environment.

Perform as   secondman at well site execution & Workshop Preparation for 2 Gravel Pack   Multizone Wells (2 zone) Sand Management services - completion Installation   using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL (ME-5) & 7 x 4   QUANTUM MAX FBSD FLOATER SERVICE TOOL (ME-3)

  • Feb 2019 – Sept 2019

Field   Supervisor, Schlumberger - Schlumberger - Completions Jakarta

Jackup   Rig and workover for oil and gas producer well in offshore environment.

- 8   Well, Supervise for Memory Gauge Installation with Drill pipe gauge carrier   to support downhole tools in Fracturing Operation for 8 wells at Offshore northwest   java sea.

Client: PHE ONWJ

- Perform   inspection for 9-5/8 X 6 MZ Express Equipment as of excess stock of client   inventory for reused or refurbish purposes

Client: Medco Energi E & P, Medco   Energi Onshore facilities, Matak, Kepulauan Seribu

  • Oct 2018 - Sept 2019

Workshop   Supervisor, Schlumberger - Schlumberger - Completions Jakarta

PHE ONWJ

Perform as Team Leader for Workshop   Preparations for:

- 2   wells Upper Dual String Completion (2-7/8 & 3-1/2 String), Using Savety   Valve, nipples, SSD, Etc

- 8   Wells Upper Completion, Using Savety Valve, nipples, SSD, etc.

  • March 2018 - Aug 2019

Workshop   Supervisor, Schlumberger - Schlumberger - Completions Russia, Sakhalinsk (STA)

Exxon Neftegas Limited

Perform Team Leader for Workshop   Preparations for:

- 9-5/8   x 6 Multilateral Operation,

- Open   hole Gravel Pack Operation using 9-5/8 x 6.00 Quantum Anti Swab (Washdown)   FBSD

- Open   Hole Stand Alone Screen using 9-5/8 X 6 Quantum Max Type IV Service Tool

  • Sept 2016 - Dec 2017

Workshop   Supervisor, Schlumberger - Schlumberger - Completions Malaysia, Labuan (STA)

Petronas Carigali Sdn Bhd,

Perform Team Leader for Workshop   Preparations for:

- PDG   Installation & PDG Surface Set up Operation (RMC Operation),

- Open   hole Gravel Pack Operation using 9-5/8 x 6.00 Quantum Anti Swab (Washdown)   FBSD

- Cased   hole PerfPack Operation using 7 X 4.00 Quantum Max POIT FBSD

  • April - July 2016

Secondman,   Schlumberger - Completions Balikpapan

Chevron IDD

Perform as Secondman and Successfully   in 2 wells deep water (Bangka – 6 & Bangka -7) of Completion installation   on Bangka Field Development project for operation below:

- Stimpac   Operation with FIV Installation and APS Systems on Deep water Well using 9   5/8 X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL

- Upper   Completion Installation with XHP Packer, Chemical Injection Valve, Tubing   Retrievable Safety Valve (TRSV) and SFIV (2 wells)

- Perform   as supervisor on Diagnostic and Opening FIV and SFIV for Well Production

  • Sept 2014 – Jan 2015

Field   Supervisor, Schlumberger - Completions Balikpapan

Perform as Filed supervisor for   completion operations as below:

- 1   well Open hole Stand Alone Screen Installation in Shallow well, running by 9   5/8 X 6 NPS Type 3 Service Tool

Client:   Total Indonesia E&P

- 1   well 5 x 2.688 Quantum Packer Installation in workover well

- 1   well of POOH Existing completion

- Frack   n pack operation at workover well using 9 5/8 X 6 QUANTUM MAX FBSD FLOATER   SERVICE TOOL

Client:   Chevron IBU

  • Aug – Oct 2014

Secondman, Schlumberger - Completions Balikpapan – Duri

- 1   well, Perform as Secondman in Multizone Gravel Pack APS operation using 9 5/8   X 6 QUANTUM MAX FBSD FLOATER SERVICE TOOL

Client:   Total Indonesia E & P, Balikpapan

- 1   well, ESP Completion Installation

Client:   chevron IBU, Balikpapan

- 1   well RMC Completion with DLH Packer and NDPG Installation

Client:   CPI, Duri

  • July 2014

Field   Supervisor, Schlumberger - Completions Duri

Chevron Pasific Indonesia

Perform as Field superviosr at Drilling   rig, lower completions installation in Land rig for operation below:

- Horizontal   Open hole Stand Alone Screen Installation in Shallow well, running by 9 5/8 X   6 NPS Type 3 Service Tool

- Retrieve   RMC completion works over well. Minas, Riau

  • April – May 2014

Field   Supervisor, Schlumberger - Completions Jakarta

BP Tangguh LNG

- Perform   as field supervisor for Permanent packer installation set by 7 X 4 Wireline   adapter kit to support Well Testing operation multizone (2 zone)

  • July 2013 – Oct 2013

Field   Supervisor Schlumberger - Completions Duri

Perform as Field Supervisor including   workshop preparation and focal point at to the client in the wellsite and   execute job for

- 8   well of Horizontal Open hole Stand Alone Screen Installation in Shallow well,   running by 9 5/8 X 6 NPS Type 3 Service Tool

- 3   well of Memory Gauge installation in Swabbing operation at, Work Over Well

  • June 2013 – April 2014

Junior   Field specialist - Secondman,

Schlumberger   - Completions Duri-Balikpapan

Involved in job preparation at the   workshop and working as Secondman for job execution at the well site for some   of lower completion installations for Client at Duri & Balikpapan:

- 2   well of Horizontal Open hole Stand Alone Screen Installation in Shallow well,   running by 9 5/8 X 6 NPS Type 3 Service Tool

- High-Rate   Water Pack running by 7 x 4 QUANTUM MAX FBSD FLOATER SERVICE TOOL

- 2 Recompletion   Wells with High-Rate Water Pack running by 7 x 4 QUANTUM MAX FBSD FLOATER   SERVICE TOOL

- 3   wells ESP Completion Installation

  • Oct 2012 – Jan 2013

Junior   Field Specialist - Crew Member, Schlumberger - Completions Balikpapan-Duri

Involved in job preparation at the   workshop and working as crew member for job execution at the well site for   some of lower completion installation:

- 1   well of Single Trip Multi Zone High-Rate Gravel Pack MZ XPRESS. 2nd RUN in   Indonesia; running by 7 X 2.813 QUANTUM MAX FBSD MZ XPRESS Service tool

Client:   Chevron IBU, Balikpapan

- 1   well of Horizontal Open hole Stand Alone Screen Installation in Shallow Well,   running by 9 5/8 X 6 NPS Type 3 Service Tool

Client:   CPI, Duri

- 1   well of Memory Gauge installation in Swabbing operation at, Work Over Well

Client:   CPI, Duri

- 1 High-Rate   Water Pack running by 7 x 4 QUANTUM MAX FBSD FLOATER SERVICE TOOL

- 1   well ICD Premium Standalone Screen Completion Installation with MFIV, running   by 7 X 4.000 QUANTUM ANTI-SWAB MUDSOLV FULL BORE SETDOWN SERVICE TOOL,   FLOATER

Timeline

Senior Completions Field Specialist

PT Dowell Anadrill Schlumberger
09.2016 - Current

Junior Completions Field Specialist

PT Dowell Anadrill Schlumberger
08.2013 - 09.2016

Field Specialist Trainee

PT Dowell Anadrill Schlumberger
09.2012 - 09.2013

Assistant Project

PT Pindad
05.2012 - 07.2012

SHE Officer

PT Pama Persada Nusantara
08.2011 - 03.2012

Internship

PT Pertamina Hulu Energy ONWJ
02.2011 - 03.2011

Bachelor of Science - Industrial Engineering

Bina Nusantara University

Associate of Applied Science - Chemical Engineering

Politeknik Negeri Bandung

SENIOR HIGH SCHOOL -

SMA Negeri 1 Baleendah

JUNIOR HIGH SCHOOL -

SLTPN 1 Ciparay

ELEMENTARY SCHOOL -

SDN 1 Bina Harapan
Gan Gan Ginanjar