Summary
Overview
Work History
Education
Skills
Certification
Timeline
AdministrativeAssistant

Your Name

Phnom Penh,12

Summary

CV Respected Sir, Sub: Application for the COTROL ROOM OPERATOR Being given to understand that there is vacancy in your Esteemed Organization. I enclosed herewith my complete resume for Summary: B.E in Electrical Engineering with 13+years(Abroad 9years and local 4years) of work experience in CCPP and Thermal Power Plant. I am currently working with CAMBODIAN ENERGY LIMITED ,CAMBODIA Extensive experience in combined cycle and thermal power plant operation and maintenance planning and execution. If you given an opportunity to serve in your establishment consider with my qualification and experience, I assure you that I shall discharge my duties for the progress of the company with entire satisfaction of my Superiors. Thanking you and expecting your earlier response. Regards, PALANIAPPAN SETHURAMAN RESUME NAME: PALANIAPPAN.S CAREER OBJECTIVE: Intend to work in a globally competitive environment on challenging fields that shall yield the twin benefits of the job satisfaction and a steady paced professional growth

Overview

2024
2024
years of professional experience
3
3
Certifications

Work History

BTG SR CONTROL ROOM OPERATOR, BOILER

CAMBODIAN ENERGY LTD, ENERGY LTD
  • PROFILE : Operation & Maintenance of 1X150MW CFBC
  • CLIENT : “CAMBODIAN, : GE CAPACITY : 1X465TPH, 168Kg/Cm2, 5670 C TURBINE : 1X150MW of GE ,“ 60 Stages with 6Extractions”
  • TYPE : SINGLE REHEAT,SURFACE CONDENSOR
  • DCS : TOSMAC, GE MAR 6.

BOILER

CFBC, Power Plant
01.2013
  • Senior Control room opertator and involve in execution of Operation and Maintenance

BOILER

CAMBODIAN ENERGY LTD, WUXI LTD
04.2019 - Current
  • Operation & Maintenance of 2X60 MW CFBC
  • CLIENT
  • CAPACITY : 2X230TPH, 85Kg/Cm2, 5350 C TURBINE : 2X60MW of DONGFANG,CHINA,SURFACE CONDENSOR “21 Stages with 6Extraction”
  • DCS :, CAPACITY : 4X410TPH, 125Kg/Cm2, 5400 C TURBINE : 4X125MW of BHEL,INDIA
  • TYPE : SINGLE REHEAT,SURFACE CONDENSOR
  • DCS : METSO.

TURBINE CONTROL ROOM OPERATOR

BHAVANI ERECTORS PVT LTD
, KERALA
03.2017 - 03.2019
  • Operation & Maintenance of 4X125MW OIL FIRED BOILER
  • SUDANESE THERMAL POWER GENERATING COMPANY LTD

CONTROL ROOM AND FIELD OPERATOR

M/S LANCO KONDAPALLI POWER
Vijayawada, Andhrapradesh, A.P
04.2015 - 02.2017
  • MW Combined Cycle Power Plant, CAPACITY
  • GAS TURBINE : 2 X 120 MW
  • MAKE : GE FRAME 9E
  • STEAM TURBINE : 1 x 128MW
  • MAKE : GE Supplied BY ALSTOM
  • HRSG : Vertical, Induced Circulation based HRSG system with Drum level control,attemperation and PRDS control system, covering whole water and steam cycle
  • MAKE : GE Supplied BY ALSTOM
  • CAPACITY : 2X186TPH, 87Kg/Cm2, 5350 C
  • STEAM TURBINE : Lube oil, jacking oil, governing oil system, vacuum system, Gland AUXILIARIES steam system, condensate system, steam bypass system
  • GENERATOR : Hydrogen cooled Generator with Stator water cooling system, Gas AUXILIARIES cooler, Refrigeration units, Shaft seal oil system.

BOILER

POWER PVT LTD, JIANGLIAN ENERGY LTD, SHA TURBINE
10.2009 - 07.2013
  • HOSPET, KARNATAKA
  • CAPACITY : 1X140 TPH, 85 Kg/Cm2, 5250 C TURBINE : 1X32 MW of YUAN, CO., LTD., CHINA
  • 18 Stages with 3 Extraction cum air cooled condensing”
  • DCS : METSO
  • 3Years 5months), RESPONSIBILITIES FOR COAL PLANT
  • Responsible for Operation & Maintenance of BTG Surface Condenser
  • Checking interlocks before start up of BTG and its auxiliaries
  • Maintaining specified parameters like pressure, temperature, levels either in auto or manual
  • Handled critical situations in BTG operation in a systematic and efficient way
  • Analysis of tripping& trouble shooting for Preventive Measures
  • BTG cold & hot rolling
  • Fans start up ,Burner line up ,Drum ,Draft maintain and PRDS, Main steam line, Deaerator charging ,Heaters charging
  • Handled vacuum building equipment’s like Steam Hogger& Steam Ejector, vacuum pump
  • Knowledge of Turbine Lube, Control & Trip oil lines
  • Guiding the field engineers during normal activities and emergency operations
  • Coordinating with the other department peoples, to ensure the proper functioning of the system
  • Noting down the various activities in logbook performed during the shift
  • Maintain the DCS and Field log sheets and ensure the correct update of the records
  • Undergone cold start up, hot start up, warm start up, and normal running shift activities
  • Responsible start up & shut down procedure, rolling & synchronization procedure and normal operations
  • Equipments change over activities on scheduled time
  • Emergency condition operations like trips and block out, home load
  • Make periodic inspections to see that all equipment and controls are operating properly and are in good condition
  • Maintain PTW System and LOTTO
  • JOB PROFILE & RESPONSIBILITIES FOR COMBINED CYCLE POWER PLANT
  • Taking care of Gas Turbine and steam turbine as per regular operation practice
  • Startup and shutdown of gas turbines, steam turbine and HRSG boilers in different conditions
  • Ensuring reporting of defects during normal running condition
  • Preparing, issue and cancelation of permits during regular operation and unit shutdowns
  • Following up mechanical isolations & ensuring safety measures during activities
  • Planning and effecting changeover schedules of various equipment’s and instruments to increase machine up time and equipment reliability
  • Identifying areas of obstruction / breakdowns and taking steps to rectify the equipment through application of troubleshooting tools
  • Preparation of daily& monthly generation reports
  • OTCW SYSTEM
  • COMPRESSOR SYSTEM
  • FUEL OIL SYSTEM
  • ASH AND COAL HANDLING SYSTEM.

FIELD OPERATOR

05.2014 - 1 1
  • VALUTHUR GAS POWER STATION DESIGNATION : TURBINE CONTROL ROOM AND
  • INSTALLED : 186MW Combined Cycle Power Plant,TAMIL NADU.

CONTROL ROOM OPERATOR

ENMAS O&M SERVICES PVT LTD
1 1 - 1 1
  • Operation & Maintenance of 1X32MW CFBC.

Education

B.E - ELECTRICAL & ELECTRONICS

A.M COLLEGE OF ENGINEERING, ANNA UNIVERSITY

HSC - undefined

E.R Higher Secondary School, TAMIL NADU STATE BOARD

SSLC - undefined

SRI V.V HIGH SCHOOL, Nadu State Board

Skills

MAKEundefined

Certification

2X60MW

Timeline

BOILER

CAMBODIAN ENERGY LTD, WUXI LTD
04.2019 - Current

TURBINE CONTROL ROOM OPERATOR

BHAVANI ERECTORS PVT LTD
03.2017 - 03.2019

CONTROL ROOM AND FIELD OPERATOR

M/S LANCO KONDAPALLI POWER
04.2015 - 02.2017

FIELD OPERATOR

05.2014 - 1 1

BOILER

CFBC, Power Plant
01.2013

BOILER

POWER PVT LTD, JIANGLIAN ENERGY LTD, SHA TURBINE
10.2009 - 07.2013

BTG SR CONTROL ROOM OPERATOR, BOILER

CAMBODIAN ENERGY LTD, ENERGY LTD

B.E - ELECTRICAL & ELECTRONICS

A.M COLLEGE OF ENGINEERING, ANNA UNIVERSITY

HSC - undefined

E.R Higher Secondary School, TAMIL NADU STATE BOARD

SSLC - undefined

SRI V.V HIGH SCHOOL, Nadu State Board

CONTROL ROOM OPERATOR

ENMAS O&M SERVICES PVT LTD
1 1 - 1 1